Case: 45990
Initial Filing Date: 12/5/2023
Summary: 20.17% Residential, 24.03% Water Heating, 11.66% Small General Service, 10.23% Demand General Service, 16.49% Large Power Service, 9.04% High Load Factor, -4.05% Outdoor Lighting, 2.41% Street Lighting
Effective Date: Phase 1 – 3/1/2025, Phase 2 – 12/31/2025
Status: Settled
Type: Electric