WA – Cascade Natural Gas Corporation

Case: UG-24008 Initial Filing Date: 3/29/2024 Summary: 2025: 12.62% Residential, 4.42% Commercial, 4.47% Industrial, 3.93% Large Volume, 4.13% Interruptible, 32.98% Transportation 2026: 2.08% Residential, 1.60% Commercial, 1.29% Industrial, 1.31% Large Volume, 0.88% Interruptible, 4.98% Transportation Effective Date: 3/1/2025 & 3/1/2026 Status: Pending Type: Gas Continue reading

TX – AEP Texas

Case: 56165 Initial Filing Date: 2/29/2024 Summary: 14.77% Residential, -9.01% Secondary <= 10kW, 14.04% Secondary > 10kW, 21.72% Primary, -27.86% Transmission, -5.33% Lighting Effective Date: 4/5/2024 Status: Pending Type: Electric

CA – Southern California Edison

Case: A-23-05-010 Initial Filing Date: 5/12/2023 Summary: “2025: $1.895 billion increase (22.6% increase over 2024) 2 for a revenue requirement of $10.267 billion • 2026: Additional $619 million (6% increase over 2025) • 2027: Additional $664 million (6% increase over 2026) • 2028: Additional $705 million (6% increase over 2027)” Effective Date: 1/1/2025 Status: Pending... Continue reading