WA – Puget Sound Energy

Case: UG-240005 Initial Filing Date: 2/15/2024 Summary: 2025: 17.9% Residential, 23.1% Commercial & Industrial, 16.7% Large Volume, 15.4% Interruptible, 9.5% Limited Interruptible, 21.2% Non-exclusive Interrruptible, -51.9% Exclusive Interruptible, 19.0% Contracts. 2026: 2.0% Residential, 2.5% Commercial & Industrial, 1.9% Large Volume, 1.7% Interruptible, 0.8% Limited Interruptible, 2.0% Non-exclusive Interruptible, -30.5% Exclusive Interruptible, 4.7% Contracts. Effective Date:

WA – Puget Sound Energy

Case: UE-240004 Initial Filing Date: 2/15/2024 Summary: 2025: 6.9% Residential, 6.4% Secondary Voltage, 5.9% Primary Voltage, 5.3% High Voltage, 0.0% Lighting, 23.0% Retail Wheeling & Contract. 2026: 9.6% Residential, 9.1% Secondary Voltage, 9.0% Primary Voltage, 8.4% High Voltage, 9.2% Lighting, 2.6% Retail Wheeling & Contract. Effective Date: 1/1/2025 Status: Pending Type: Electric

AZ – Southwest Gas Corporation

Case: G-01551A-23-0341 Initial Filing Date: 2/2/2024 Summary: 13.99% Residential Single Family, 16.55% Residential Multi-Family, 13.11% Residential Single Family Low Income, 19.92% Residential Multi-Family Low Income, 14.51% Residential Gas Service for Air Conditioning, 6.79% Master-Metered Mobile Home Park, 18.51% Small General, 13.08% Medium General, 6.17% Large-1 General, 6.91% Large-2 General, 10.07% Transportation Eligible, 5.16% Air Conditioning

WordPress › Error

There has been a critical error on this website.

Learn more about troubleshooting WordPress.